Use this checklist in the weeks before your season opens so these are ready before the first boats arrive:
Rates
Contracts
Staff access
Your public profile
Your dock tools
Work through it in order; each phase builds on the one before.
Who can do this: Admin (Dockmaster and Finance users can help with some steps)
Where: Settings (Users, Transient Rates, Public Profile, Hospitality, Dry Stack, Electric), Contracts, Assignments
Before you start: Confirm your season dates, rate changes and staff list for the year.
8 to 12 weeks out: rates and contracts
Duplicate last year's transient season in Settings → Transient Rates (Edit → Duplicate Season), then check the new dates, name and Accept reservations for this season starting on date before updating rate strategies.
Duplicate each seasonal or annual contract group in Contracts for the new season. Check Copy existing boats into new group? to bring over returning boaters, then update dates, pricing and contract language.
Review pre-assigned slips carried over from last year.
Send renewal contracts and track who has signed.
Review discounts and coupon codes in Settings → Discounts and Coupon Codes. Remove expired ones.
Confirm taxes in Settings → Taxes are current. Check with your accountant if rates changed; Dockwa can't advise on tax rates.
4 to 8 weeks out: team and access
In Settings → Users, add this season's staff with the right role (Admin, Dockmaster, Finance or Viewer) and remove anyone who has left.
Check each user's notification settings so the right people get reservation and payment alerts.
Have dock staff install the Dockwa app and confirm they can reach the Dockmaster view.
Pair and test card readers and receipt printers if you use Point of Sale.
Update Point of Sale items, fuel prices and quick keys.
2 to 4 weeks out: what boaters see
Work through the Public Profile Optimization Checklist: description, photos, amenities, fuel prices and fuel dock hours.
Update Settings → Hospitality with this year's gate and bathroom codes, Wi-Fi, approach and check-in instructions.
Confirm your cancellation policy and check-in and check-out times. These aren't in Settings; contact Dockwa Support to change them.
Check that the booking form on your website still loads and books correctly.
Consider a Dockwa Deal for shoulder-season dates.
1 to 2 weeks out: operations
Review Assignments for opening week: returning boaters, placeholders, and any spaces out of service.
If you run dry stack, update Settings → Dry Stack: operating hours, break window, slots per window, launch locations and holiday exception dates. Turn on Enabled status when you're ready for boater bookings.
If you use metered electric, confirm meters in Settings → Electric and record a starting reading on every meter with Record without billing.
Review your Waitlist and offer open spaces before opening day.
Check your payout bank account details in Account → Configure Bank.
Opening week
Walk the docks with the Dockwalk tab to confirm occupied and vacant spaces.
Check in arriving boaters so your team can see who's on site.
Review the Dashboard each morning for arrivals, departures and pending requests. Respond to pending requests before they expire.
Check that the first contract installments and transient payments processed as expected.
